Erection and removal of scaffolding
Erecs:
Preparation work: including material inspection, foundation treatment, erection scheme design, etc.
Erection process: erect according to the design scheme to ensure the stability and safety of the scaffold. During erection, attention shall be paid to details such as fastening of fasteners, verticality of vertical pole and levelness of crossbar.
Acceptance inspection: acceptance inspection shall be carried out after erection to ensure that the scaffold meets the requirements for safe use.
Demolition:
Preparation before dismantling: including cleaning up sundries on the scaffold, setting up warning areas, and arranging special personnel for monitoring, etc.
Demolition process: from top to bottom and from outside to inside. Throwing of rods and fasteners is strictly prohibited. Attention should be paid to safety during demolition to avoid collapse.
Post-removal treatment: classify and stack the removed rods and fasteners, and clean up the site in time.